 |
| Aircraft Overview |
 |
| Aircraft Make: |
 |
2001 Dornier |
|
|
 |
| Aircraft Model: |
 |
328-300 |
|
|
 |
| Registration: |
 |
N425FJ |
|
|
 |
| Serial Number: |
 |
3189 |
|
|
 |
| Ask Price: |
 |
$3,495,000 |
|
|
 |
 |
| Airframe Time |
 |
| Total Time: |
 |
9,172.3 |
|
|
 |
| Landings: |
 |
9,649 |
|
|
 |
 |
| Left Engine |
 |
| Serial Number: |
 |
CD0178 |
|
|
 |
| Engine Model: |
 |
Pratt and Whitney PW306B |
|
|
 |
| Engine Program: |
 |
Enrolled on Ultimate Jet FMP |
|
|
 |
| Total Time Since New: |
 |
7,742.2 |
|
|
 |
| Cycles: |
 |
8,034 |
|
|
 |
|
 |
Overhaul Interval: On Condition |
|
|
 |
 |
| Right Engine |
 |
| Serial Number: |
 |
CD0177 |
|
|
 |
| Engine Model: |
 |
Pratt and Whitney PW306B |
|
|
 |
| Engine Program: |
 |
Enrolled on Ultimate Jet FMP |
|
|
 |
| Total Time Since New: |
 |
7,837.9 |
|
|
 |
| Cycles: |
 |
8,023 |
|
|
 |
|
 |
Overhaul Interval: On Condition |
|
|
 |
 |
| APU |
 |
| APU Model: |
 |
Garrett GTCP 36-150DD |
|
|
 |
| Total Time Since New: |
 |
7,886 |
|
|
 |
 |
| Avionics |
 |
|
 |
EFIS: 5 Tube Honeywell DU-870
Comm: Dual Honeywell RCZ-833E Nav: Dual Honeywell RNZ-851 DME: Dual Honeywell RNZ-851C Radar: Honeywell WU-880 CVR: L3 Communications FDR: L3 Communications EGPWS: Honeywell MK-V TCAS: Honeywell RT-950 TCAS II IAC: Honeywell IC800C Integrated Avionics Computer Radar Alt: Honeywell RT-300 CDU: Honeywell CD-810 FMS Control Unit GPS: Honeywell HG2021GD02 Data Loader: Honeywell DL-900 Standby Horizon: Jet AI 330K Cabin Briefer: Heads-up PBS250 |
|
|
 |
|
 |
 |
| Exterior |
 |
|
 |
Overall white with dark green and gold stripes. New paint 2006. |
|
|
 |
 |
| Interior |
 |
|
 |
30 Passenger commuter configuration features 10 single forward-facing seats and 10 double seats on the right hand side of the aircraft. The airplane also features a forward flight attendant seat, aft private lavatory and aft galley. The 226 cu. ft. Class C Baggage Compartment is accessed via the external cargo door and is separated from the cabin by the rear bulkhead. |
|
|
 |
 |
| Maintenance |
 |
|
 |
Phase 1 Inspection Completed 01/21/10 Phase 2-6 Inspections Completed 12/28/2009 by Ultimate Jet FAR 91.411/413 Completed 12/2009 Landing Gear Overhaul Due 07/27/2011 |
|
|
 |
|
 |